Transportation, Assembly and Installation of Eight Thermo Fisher DDG3 High-Performance Digital Density Gauges Containing Radioactive Sources
Client
NORINCO International Cooperation Ltd. — Coal Handling Representative Office
Implementation period
2024.02.28 — 2024.09.22

We completed the import, customs clearance, licensing, transportation, temporary storage, assembly, installation and electrical connection of coal density gauges containing radioactive sources for use in the coal beneficiation plant of Erdenes Tavan Tolgoi JSC.
Equipment Receipt and Customs Clearance: Received the coal density gauges containing radioactive sources at Chinggis Khaan International Airport and completed import customs clearance.
Licensing and Documentation: Obtained the required licenses for importing and transporting radioactive sources from the competent government authorities and prepared the supporting documentation.
Transport Route Approval: Obtained approval for the radioactive source transportation route from the relevant authorities.
Equipment Transportation: Loaded and transported the equipment to the Erdenes Tavan Tolgoi JSC coal beneficiation plant in Tsogttsetsii soum, Umnugovi Province.
Temporary Storage and Handover: Unloaded and sealed the equipment at the plant’s designated temporary radioactive source storage facility and handed it over for storage in accordance with applicable procedures.
Work Authorization: Obtained the required permit to begin assembly and installation at the plant and completed the necessary preparations.
Mounting Assembly: Positioned and assembled the density gauge mounting brackets and installation components at the locations specified in the design drawings.
Transfer to the Plant Building: Transported the equipment containing radioactive sources from the temporary storage facility to the plant building.
Lifting and Positioning: Used a crane to lift the equipment to the second floor of the plant building and move it to the installation locations.
Radioactive Source and Detector Installation: Installed the radioactive sources and measurement detectors on their designated supports and mounting assemblies.
Control Panel Installation: Assembled and installed the density gauge control and monitoring panels.
Electrical Connection and Handover: Completed the electrical connections, connected the equipment to the power supply and switched it on, then handed over the completed installation to the client.
Photos
More projects

May 2026
Supply of a Portable XRF Analyzer for Semi-Quantitative Analysis of Heavy Metals in Soil
Ulaanbaatar City Environment Department

Apr 2026
Supply of X-ray Inspection Equipment for the Customs Office at Chinggis Khaan International Airport
Ulaanbaatar City Governor’s Office
Mar 2026
Supply of Pathology Equipment to Baganuur District Health Center
Baganuur District Governor’s Office and Health Center