Relocation and Reinstallation of Radiation Monitoring Equipment for Detecting Nuclear Materials and Radioactive Sources

Client

General Customs Administration

Implementation period

2024.06.15 — 2024.09.16

Relocation and Reinstallation of Radiation Monitoring Equipment for Detecting Nuclear Materials and Radioactive Sources

Foundations and Concrete Works: Constructed foundations for the main and auxiliary RPM pillars, protective bollards and camera poles, together with associated concrete structures, in accordance with the site layout and technical requirements.

Vehicle Radiation Monitoring Equipment: Assembled and installed VM-250 radiation portal monitors (RPMs) for screening vehicle traffic.

Pedestrian Radiation Monitoring Equipment: Installed PM-700 RPMs inside the border crossing building for pedestrian screening.

Electrical Distribution Panels: Installed and connected power distribution panels for the vehicle and pedestrian radiation monitoring equipment.

Protective Bollards and Camera Poles: Installed 250 mm and 150 mm protective bollards and surveillance camera poles in accordance with the design drawings.

Power and Network Infrastructure: Routed and connected power supply and data network cables, and tested the connections.

CCTV System: Installed cameras for visual monitoring of equipment operation and connected them to the surveillance system.

Server and Control System: Installed and configured the server and centralized control system for receiving, processing and monitoring data from the radiation monitoring equipment.

RAVEN Software: Installed the RAVEN radiation monitoring software, connected it to the equipment and completed the required configuration.

Equipment Calibration and Operational Verification: Used radioactive sources to calibrate the detectors and perform operational checks and verification tests.